How to Estimate Roof Replacement Cost (2026): Worked Example

Estimate a roof replacement by hand in six steps, from footprint to allowances, with a fill-in worksheet and a fully labeled worked example.

$12,000–$16,000

Short answer

Estimate a roof replacement by hand in six steps, from footprint to allowances, with a fill-in worksheet and a fully labeled worked example.

How to estimate roof replacement cost: the formula

A homeowner's estimate comes down to one line of math:

Total = (roof area × installed rate × adjustments) + tear-off + permits and disposal + decking allowance

This is the formula TheRoofBill's roof replacement cost calculator runs, using the inputs published on our methodology page. Doing it by hand shows you where the number comes from, so you can check a bid line by line.

The short answer

Get the roof area from footprint × slope factor, price it at an installed rate per square foot, adjust for pitch, shape, your state's labor and stories, then add tear-off, permits and a 10% decking allowance. The worked example below takes a Georgia hip roof from measurements to $12,000–$16,000 in six steps.

Step 1: Find the footprint, not the living area

Measure the building's outside dimensions on the ground (length × width), including an attached garage and any porch with its own roof. A two-story house's footprint is roughly its ground floor, not its total living area. See roof replacement cost by house size for how much that matters.

Step 2: Convert footprint to roof area and squares

Multiply the footprint by the slope factor for your pitch, then divide by 100 for squares:

PitchRise per 12 in of runSlope factor (model)
Low3/12 or less1.04
Medium4/12–6/121.12
Steep7/12–9/121.25
Very steep10/12 and up1.40

The model doesn't add overhangs or waste. Overhangs add real roof area; waste affects how much material is ordered, which is already reflected in installed rates. Our roofing square guide explains the unit. Don't know your pitch? The roof pitch calculator works it out from a rise and run or an angle.

Step 3: Choose an installed rate

Installed rates bundle material and labor per square foot of roof. The model's 2026 rates include:

MaterialInstalled rate per sq ftTear-off per square per layer
3-tab asphalt$4.00–$6.00$39–$53
Architectural asphalt$5.21–$6.82$39–$53
Class 4 impact-resistant shingles$6.50–$9.50$39–$53
Corrugated metal$5.00–$10.00$50–$85
Standing seam metal$10.00–$16.00$50–$85
Wood shake$8.00–$14.00$55–$90
Concrete tile$10.00–$16.00$60–$95
Clay tile$12.00–$18.00$60–$95
Natural slate$15.00–$28.00$60–$95
TPO or EPDM membrane (flat)$8.23–$10.54$40–$60

Tear-off rates assume the old roof is the same material as the new one. More comparisons are in cost per square foot.

Don't add a separate labor line on top of an installed rate; that counts labor twice. If you want to see the labor share on its own, see roofing labor cost per square.

Step 4: Apply the adjustments

Multiply four factors together and apply the result to the installed line:

  • Pitch: 1.00 for low and medium, 1.25 for steep, 1.60 for very steep.
  • Shape: 1.00 simple gable, 1.12 hip, 1.28 complex (dormers, valleys).
  • State labor factor: 0.79 (Oklahoma) to 1.41 (Illinois); the national baseline is 1.00.
  • Stories: 1.00 for one, 1.05 for two, 1.10 for three.

Step 5: Add tear-off, permits and decking

  • Tear-off: squares × the tear-off rate × number of layers removed. Zero layers means an overlay, which the code allows only in limited cases; see roof tear-off cost.
  • Permits and disposal: the model uses $300 at the low end and $480 at the high end for the job.
  • Decking allowance: 10% of the installed line, for damaged sheets found once the old roof is off. See roof decking replacement cost.

Step 6: Add any extras

The calculator's optional add-ons, if your roof has them: skylight flashing or replacement $300–$800 each, chimney flashing $400–$1,000, ridge vent upgrade $400–$900, ice and water shield at eaves and valleys $500–$1,200.

Worked example, fully labeled

A one-story house in Georgia with a 1,800 sq ft footprint, a 6/12 hip roof, architectural shingles and one layer to remove:

LineCalculationLowHigh
Roof area1,800 × 1.12 = 2,016 sq ft (20.16 squares)
Adjustment factor1.00 pitch × 1.12 hip × 0.85 Georgia × 1.00 one story = 0.9520
Installed line2,016 × $5.21–$6.82 × 0.9520$9,999$13,089
Tear-off20.16 × $39–$53 × 1 layer$786$1,068
Permits and disposalModel allowance$300$480
Decking allowance10% of installed line$1,000$1,309
TotalSum of lines$12,085$15,947

Rounded, that's about $12,000–$16,000, or roughly $599–$791 per square all-in. Enter the same inputs in the calculator and you'll get the same range, because it's the same formula.

Fill-in worksheet

Copy this into a notebook or spreadsheet:

LineYour numbers
Footprint (length × width), sq ft
Slope factor (1.04 / 1.12 / 1.25 / 1.40)
Roof area = footprint × slope factor
Squares = roof area ÷ 100
Installed rate, low–high per sq ft
Adjustment = pitch × shape × state × stories
Installed line = roof area × rate × adjustment
Tear-off = squares × rate × layers
Permits and disposal$300–$480
Decking allowance = 10% of installed line
Extras
Total

If you're a contractor pricing a job

Contractors usually price bottom-up instead: measured squares and waste for materials, a crew cost per square from production rates, tear-off and dump fees, permits, then overhead and profit. RoofSnap's labor-estimating guide (updated April 3, 2026) works through a five-person crew at $1,380 per day: about $69 per square on a simple roof at 20 squares a day, $99 at 14 and $173 on a steep roof at 8, all before overhead and profit. A homeowner's top-down estimate and a contractor's bottom-up bid should land in the same neighborhood; if they don't, the scope usually differs.

When an estimate can't replace a quote

A hand estimate can't see the deck, the flashing, the ventilation or local code requirements. It also uses statewide labor factors, not your metro's market, and no estimate tracks post-storm price spikes. Use your number to judge whether bids are plausible, then compare at least three written quotes on the same scope. Our roofing estimate red flags checklist shows what each line should say.

The next step

Get your number in 60 seconds.

Answer a few quick questions and get an itemized 2026 estimate for your roof. No email, no sales calls.

Open the Roof Cost Calculator →

Based on 2026 public cost data. See the methodology.

Sources and estimate date

Formula and every model input from TheRoofBill's published methodology, calculated November 15, 2026. Contractor production-rate example: RoofSnap, How to Estimate Labor Cost for Roofing, last modified April 3, 2026.

More step-by-step help is in our contractor guides.

The next step

Get your number in 60 seconds.

Answer a few quick questions and get an itemized 2026 estimate for your roof. No email, no sales calls.

Open the Roof Cost Calculator →

Based on 2026 public cost data. See the methodology.

Frequently asked questions

How do you estimate the cost of a new roof?

Multiply your footprint by a slope factor to get roof area, convert to squares (divide by 100), multiply roof area by an installed price per square foot, then adjust for pitch, roof shape, local labor and stories. Add tear-off per square per layer, permits and disposal, and a decking allowance. TheRoofBill's calculator runs exactly this formula with published inputs.

What is a roofing estimate example?

For a one-story 1,800 sq ft footprint in Georgia with a 6/12 hip roof, architectural shingles and one layer removed, TheRoofBill's model gives about 2,016 sq ft of roof (20.2 squares) and a total of about $12,000–$16,000: $9,999–$13,089 installed, $786–$1,068 tear-off, $300–$480 permits and disposal, and $1,000–$1,309 decking allowance.

Can I estimate a roof from my home's square footage?

Only roughly. Living area counts every floor, while the roof covers the footprint plus overhangs. Use the ground-floor footprint (including an attached garage), then apply the slope factor. A measured roof report or the roofer's measurement should replace your estimate before you compare bids.

How do contractors price a roofing job?

Most build it from measured squares: materials with waste, a crew labor cost per square based on how many squares the crew installs per day, tear-off and disposal, permits, then overhead and profit. RoofSnap's estimating example shows crew cost alone at $69–$173 per square depending on roof difficulty, before overhead and profit.

Cost figures are planning estimates based on 2026 public data (Homewyse, Angi, Fixr, BLS). They are not contractor quotes. Full disclaimer · How we calculate.